Skip to content

Setup Videos

Unbox, inflate, install, take down. Every product, start to finish.

For event planners

The Holiday
Install Series

Order by: standard colors
Nov 16
Order by: custom
Pantone · Nov 2
Last rush ship date
Dec 14
Install time: 9 ft tree, 2 people
2 hrs

Watch this first · 2 min

Know before install day

  1. Learning 1

    Light chrome from the front

    Mirror finishes reflect, they do not glow. Aim lights at the balls, not behind them.

  2. Learning 2

    Unbox and count on delivery day

    Check every piece against the packing list the day it lands, not install day. Leaves time to fix gaps.

  3. Learning 3

    Chrome shows fingerprints

    Handle with gloves, wipe last. Do the final polish after all other trades are done.

  4. Learning 4

    Anchor everything outdoors

    Use the D-rings and weights on every ball. A loose ball in wind is a liability, not a decor issue.

  5. Learning 5

    Cold venues: top up the air

    Air contracts in the cold. Outdoor and loading-dock installs can look soft by morning. Plan a top-up pass.

  6. Learning 6

    Inflate on site, not before

    A 6 ft+ ball will not fit through a standard door inflated. Bring it in flat and inflate in place.

Install day, step by step

  1. Step 01

    Unbox + inventory check

    What is in the box, packing list, check for damage, where the repair kit is.

    Chapters & transcript
    1. What is in the box
    2. Packing list check
    3. Check for damage
    4. Where the repair kit is
  2. Step 02

    Inflate: flat to full

    Blower setup, valve, how full is full, sealed vs blower-fed.

    Chapters & transcript
    1. Blower setup
    2. The valve
    3. How full is full
    4. Sealed vs blower-fed
  3. Step 03

    Build the ornament cluster

    Piling striped, Fair Isle and solid balls so the pile looks full, not random.

    Chapters & transcript
    1. Pick the base balls
    2. Mixing striped, Fair Isle and solid
    3. Filling gaps so it looks full
  4. Step 04

    Cone tree and ball tree assembly

    9 ft (4 levels) and 13 ft (5 levels). Order of build, connecting the D-rings.

    Chapters & transcript
    1. 9 ft tree, 4 levels
    2. 13 ft tree, 5 levels
    3. Connecting the D-rings
  5. Step 05

    Anchoring outdoors + hanging

    Weights, stakes, rigging points, wind limits.

    Chapters & transcript
    1. Weights
    2. Stakes
    3. Rigging points
    4. Wind limits
  6. Step 06

    Teardown + storage

    Deflate, fold, box. Store for next season.

    Chapters & transcript
    1. Deflate
    2. Fold
    3. Box and store
Stuck on site? Call us.
Install day help

Stuck on site? Call us.

Live help for planners during holiday install season, 7 days a week.